1. Charger is certified for compatibility by FLEXECHARGE
See list of certified chargers here: Charging Stations
2. Only one load management
Disable any other load or energy management, as to not interfere with the HARMON-E load manager
2. Activate meter values
To operate perfectly, the load manager requires specific meter values in 15 second intervals from each charger.
Activate the following meter values through your CPMS:
AC Charging Stations | DC Charging Stations |
|
|
Sampled Meter Data Interval | |
15 Seconds |
3. Change the OCPP URL
Change the OCPP URL in the charger to point to HARMON-E. See here how it works: Add a charging station
Related to
Comments
0 comments
Please sign in to leave a comment.