The load management is able to process all control signals from grid operators (medium voltage & low voltage) for stepped or step less control of the load.
At sites where Distribution Network Operators (DNO) require an interface to their local controllers, you always install a Gateway Connect.
HARMON-E is compliant with VDE-AR-N-4100, VDE-AR-N-4105 and VDE-AR-N-4110 in Germany.
Please refer to the attached documentation for further explanation.
Comments
0 comments
Please sign in to leave a comment.